Contents
- MARM Principles
- 1. Introduction
- 2. References (detail of the legislation and the guidance informing content)
- 3. Information Gathering
- 4. Scoping the MARM Risk Action Planning Meeting
- 5. The MARM Risk Action Planning Meeting
- 6. Test of Engagement
- 7. Review
- 8. Case Closure
- 9. 7 Step Summary
- 10. Inherent Jurisdiction
- 11. Timescales
- 12. Escalation of Concerns
- 13. Information Sharing
- 14. Protection v Self Determination
- Appendix A – Case Scenarios Where the MARM Process May Apply
- Appendix B – Making Safeguarding Personal Principles
- Appendix C – Standard Meeting Agenda Template
- Appendix D – Multi-Agency Risk Action Plan Template
MARM Principles

1. Introduction
This document describes guidance for conducting Multi-agency Risk Management (MARM) and should be read alongside the Cambridgeshire and Peterborough Multi-Agency Adult Safeguarding Procedures.
This guidance must only to be used where the adult:
- has the mental capacity to understand the risks posed to them
- continues to place themselves at risk of serious harm or death
- refuses or is unable to engage with necessary care and support services.
It is essential to note that the adult must be considered to have need for care and support in line with the definition contained within the Care Act (2014); Care & Support Statutory Guidance (09/07/2018) and the Care & Support (Eligibility Criteria) Regulations (2015):
- the adult’s needs arise from or are related to a physical or mental impairment or illness
- as a result of the adult’s needs the adult is unable to achieve two or more of the outcomes specified as a consequence there is, or is likely to be, a significant impact on the adult’s well-being.
If the risk(s) is not at a level which may lead to serious harm or death the MARM process does not apply and should not be followed. Where the adult lacks capacity the Mental Capacity Act (2005) should take over and action should be taken under Best Interests (See the MARM Principles on Page 4).
The definition and understanding of self-neglect can vary considerably; for the purposes of this guidance however, self-neglect can be any of the following:
- the inability or unwillingness to care for one’s self and/or one’s environment, including hoarding
- a refusal of essential services
- a failure to protect one’s self from abuse by a third party (where “mainstream” adult safeguarding processes are not applicable or sufficient to mitigate or eradicate the risk).
An example of this may be where the adult refuses to engage with care/support services and evidence suggests that the “friendships” they are keeping, or their social network are placing them at risk of serious exploitation, harm or death. Examples of this type of situation can include the exploitation of adults in situations of sexual abuse, the trafficking (commonly referred to as “county lines”), storage (“cuckooing”) testing and use of illegal substances.
Case scenarios where the MARM Guidance may apply are included in Appendix A.
Subject matter expertise, and the inclusion of the Police in these types of situation are vital in order that all available intelligence is shared to support the achievement of proportionate, accurate and effective decision making and forward risk planning.
The guidance should be used flexibly and in a way that achieves best outcomes for the adult. It does not, for example, specify which professionals need to be involved in the process, or prescribe any specific actions that may need to be taken as this will be decided on a “case by case” basis through coordinated multi-agency working; in line with the Making Safeguarding Personal (MSP) Principles (Appendix B), agreed information sharing protocols, the General Data Protection Regulations (GDPR) 2018, and in full compliance with the Articles and Protocols of the Human Rights Act (1998) and other applicable legislation. More information resources about the Human Rights Act (1998) can be found at: https://www.equalityhumanrights.com/en/human-rights/human-rights-act
2. References (detail of the legislation and the guidance informing content)
- Peterborough and Cambridgeshire Safeguarding Adults Multi-Agency Policy and Procedures;
- Human Rights Act 1998
- The Care Act 2014
- Data Protection Act 1998 (General Data Protection Regulations 2018)
- The Mental Capacity Act 2005
- Care & Support Statutory Guidance (2018)
3. Information Gathering
At Cambridgeshire County Council & Peterborough City Council, the Adult MASH will be the ones that usually identify the MARM cases. The MASH worker will go through the usual process of information gathering to understand and decide what happens with a safeguarding concern. They may find out a lot of information (issues, possible MARM, MCA known/unknown, key stakeholders etc.) and make recommendations about next steps and allocate it to an appropriate ASC team to take forward.
4. Scoping the MARM Risk Action Planning Meeting
Where an adult meets the criteria for this guidance (essentially including formal confirmation that the adult has mental capacity in this regard, and information sharing arrangements), the practitioner initiating the MARM process) should refer to the applicable Adult Social Care (ASC) service via the local Multi-Agency Safeguarding Hub (MASH) in order that progression of the MARM process be confirmed. At this point a lead ASC Social Worker will be allocated to coordinate the process and the key agencies who are required to be (or become) involved in the Risk Action Planning Meeting will be identified. It is important to note that ASC will lead and coordinate the MARM process; the Chair of the Risk Action Planning Meeting will be an ASC Team Manager or more senior representative.
Depending on the urgency of the case, it may be necessary for professionals to prioritise the MARM Risk Action Planning Meeting. Invitees will be determined on a “case by case” basis but would ordinarily involve representatives from all key agencies who are or should be linked to the case; this may include the Police as they may hold relevant intelligence, and other agencies such as, for example, health professionals, the Fire & Rescue or Housing services.
When scoping invitees, consideration should be given to which person might be best to engage with and work effectively with the adult – this person may not necessarily be a professional from one of the key agencies, for example, this could be someone from a voluntary agency, such as an outreach worker. When scoping attendees chose people that can make decisions at the meeting rather than taking them away to get approval.
In all cases the adult should be invited to attend the MARM Risk Action Planning Meeting, with an advocate or interpreter as appropriate. Where applicable, family members and/or other representatives directly involved with the adult should also be invited to attend or to submit any relevant information in advance if they are unable to attend for any reason.
The Head of Safeguarding is available for advice and guidance at any stage.
“There is strong professional commitment to autonomy in decision making and to the importance of supporting the individual’s right to choose their own way of life, although other value positions, such as the promotion of dignity, or a duty of care, are sometimes also advanced as a rationale for interventions that are not explicitly sought by the individual” SCIE Report 46 (2001).
5. The MARM Risk Action Planning Meeting
The MARM Risk Action Planning Meeting will be chaired by an ASC Team Manager or more senior representative (a Standard Agenda Template is included as Appendix C). Capacity or lack of capacity is a vital element in risk action planning with, or on behalf of, adults who are at risk of self-neglect. Therefore, the adult’s mental capacity in respect of the specific concerns associated with the case and their consent should be discussed and confirmed at the beginning of each MARM Risk Action Planning Meeting. This should be informed by any information gathered at the meeting where not able to complete a formal MCA.
When a person’s capacity has been established, planning can follow one of two routes, either:
- In the case of a lack of capacity—this process MUST not be followed and a best interest decision should be made.
- In the case of capacity—follow this MARM Process.
Once it is clear that the adult concerned has capacity to understand the consequences of refusing or disengaging from services, participants of the Risk Action Planning Meeting, in developing a MARM Risk Action Plan (an Example Template is included at Appendix D) should follow the framework factors given below:
- Confirm the coordinating ASC Social Worker and who will be the key contact with the adult concerned (these may not be the same person in both roles).
- There will not always be an MCA assessment completed, there will be times when we assume capacity, therefore record discussions about capacity with any rationale why they have capacity. If a capacity assessment has been carried out record when, where and by whom the capacity assessment was carried out. Where the information suggests the person’s capacity may have changed consideration of how to evidence capacity should be given and recorded.
- Document evidenced based risk factors of significant harm and threat to life.
- Document the adult’s level of involvement and, where known, their desired outcomes.
- Record what needs to change to support safety and reduce risk.
- Consider and record all options for encouraging engagement with the adult.
- Ensure that all applicable agencies are actively involved if they aren’t already, this can include for example the General Practitioner (GP), Children’s Services, Fire & Rescue, Housing, Shelter, Drug & Alcohol Services, Domestic Abuse Support (NB: this is NOT an exhaustive list)
- Professionals should also consider and confirm, as applicable and appropriate, the support that carers, family members, children or other adults at risk might need, and again consider who is best placed to engage and support them.
- Develop a MARM Risk Action Plan with clear actions, timescales and responsibilities
- Document contingency planning arrangements to be instigated if the MARM Risk Action Plan is unsuccessful.
- Set clear review dates and times.
- Ensure notes from the meeting are accurately recorded and circulated to all participants and relevant others (eg: GP with the consent of the adult) within 10 working days of the meeting.
Consider which person is best placed to engage with the adult
The MARM Risk Action Plan should consider if the adult would/may respond more positively to a health, social care or a voluntary agency professional (or other person)?
The Serious Case Review written following the murder of ‘F’ revealed a lifelong history of negative involvement from both the Mental Health Services and from the Social Services Children and Families Department. She had been detained under a Mental Health Act (1983) Section on several occasions and all her children had been removed from her care. In planning an approach towards ‘F’, this information would have been vital as she would have been unlikely to engage positively with either the Mental Health Services or Social Services in the first instance.
6. Test of Engagement
Having established a MARM Risk Action Plan, the adult’s resistance or inability to engage and accept support, planning should be tested by the introduction of the Risk Action Plan by the person or the agency most likely to succeed (this will have been confirmed at the MARM Risk Action Planning Meeting – see Section 4 above).
7. Review
If the plan is still rejected, the MARM Risk Action Planning Meeting should reconvene to discuss and review the MARM Risk Action Plan. The case should not be closed simply because the adult is refusing to engage with or accept the plan.
Appropriate advice must be taken as to a reasonable review plan, including consideration of the timescales to be applied (for example from a Line Manager/Head of Service/Legal Services).
8. Case Closure
When working with an adult under the MARM guidance, there must be agreement by all professionals involved in the case that this is no longer required before this process is closed. It should be understood by all agencies that a case under the MARM may be open for a very long period of time.
The main reasons for closure would be:
- The adult is now engaging with professionals to reduce the risks
- The risk is reduced to a level that there is no longer a risk of significant harm or death
- The adult is deceased
9. 7 Step Summary
- Confirm if urgent actions have been taken or are further required:
- to meet the needs of children, other adults at risk or animals living or involved with the adult
- Public or Environmental Health concerns
- Criminal activity
- Establish and confirm mental capacity (including as applicable issues of fluctuations in capacity, and/or advance decision making), and information sharing arrangements
- Ensure advocacy is available to the adult
- Convene a MARM Risk Action Planning Meeting
- Develop the MARM Risk Action Plan
- Test Engagement
- Review
10. Inherent Jurisdiction
Adults who have capacity to make decisions which may result in them placing themselves at risk of significant harm or death may require further judicial intervention to ensure their safety. This is most likely to occur if the adult continually fails to engage with professionals and all other options have been exhausted.
There may be occasions when the courts are prepared to intervene in the case of an adult, even when they have the capacity to consent. For example, where an adult is receiving undue pressure or coercion from a third party. The Court’s purpose is not to overrule the wishes of an adult with capacity, but to ensure that the adult is making decisions freely.
Legal advice should always be sought when Inherent Jurisdiction may be a factor.
11. Timescales
It is important to agree timescales for each part of the MARM Risk Action Planning process to prevent drift. This will be different for each case dependent on individual circumstances.
It is also important to ensure that any decisions made are accurately recorded.
Within the MARM Risk Action Plan, it should be clear what the agreed actions are, who is responsible for carrying out the actions and the timescales involved. Disagreements should also be clearly documented.
12. Escalation of Concerns
The Chair of the MARM Risk Action Planning Meeting holds responsibility for the escalation of concerns as required.
It is recognised that at times there will be disagreements over the handling of concerns. These disagreements typically occur when:
- The adult is not considered to meet eligibility criteria for assessment or services.
- There is disagreement as to whether safeguarding adults procedures should be invoked.
- There is dispute about the adult’s mental capacity to make specific decisions about managing risks.
- The adult is deemed to have mental capacity to make specific decisions and is considered to be making unwise decisions.
- Professionals place different interpretations on the need for single/joint agency responses.
- Professionals feel that meeting the needs of the adult sits outside of their work remit.
- Resources are not appropriately available or allocated, it must be noted that at all times actions are required to be taken within the law and to not be constrained due to perceived limitations to organisational boundaries.
Professionals involved in this process should always try to work out their differences. Where there are irreconcilable and significant differences between professionals however, consideration should be given to including an agreed neutral third party. It may also be necessary to consider escalating the case to more senior decision makers within organisations.
13. Information Sharing
Information sharing will be in line with local Information Sharing Protocols.
14. Protection v Self Determination
The dilemma of managing the balance between protecting adults at risk from self-neglect against their right to self-determination is a serious challenge for all services. Example case scenarios are included within Appendix A.
This process does not, and should not, affect an individual’s human rights, but seek to ensure that the relevant agencies exercise their duty of care in a robust manner and as far as is reasonable and proportionate.
Applying this robust process should ensure all reasonable steps are taken to ensure safety, by a multi-agency group of professionals. This model will be critical for the reasons outlined above, but in addition will anticipate the possible extension of the definition of adults who may be in need of safeguarding (to include those at risk of harm as a result of self-harm/self-neglect).
Where possible, the adult’s views and wishes/desired outcomes should be included and if they are not present, there should be detailed reasons for this.
Appendix A – Case Scenarios Where the MARM Process May Apply
Appendix B – Making Safeguarding Personal Principles
